Run Report

To run a report:

  1. Go to Tools > Reports > Templates.
  2. Select a template, then select .
  3. Configure the following report settings:
    Title
    Enter a report title.
    Template
    The report template for the report.
    Scope
    The reports are limited to a specific site. Select from the list of configured sites.
    Period
    Select a period to gather data. Valid values are:
    • 3 Hours
    • 3 Days
    • 14 Days
    Format
    Specify the output format for this report: PDF.
  4. Before running the report, select Save Report Settings.
    After you save the Report Settings, the report displays on the Report Settings tab, and it displays in the Scheduler for ExtremeCloud IQ Controller.
  5. When running a report, you have the following options:
    • Run Now. Run the report now.
    • Scheduling. Schedule the report from the Report Settings tab. Schedule the report using Scheduler for ExtremeCloud IQ Controller.
      Note

      Note

      Scheduling is unavailable until you install and run Scheduler for ExtremeCloud IQ Controller.

      Select Scheduling to open the Scheduler application. This is a Docker application that resides on ExtremeCloud IQ Controller. Download Scheduler for ExtremeCloud IQ Controller from the Extreme Networks support portal, and install the application. For more information on installing Scheduler Application, see Scheduler for ExtremeCloud IQ Controller.

    • Cancel. To cancel the report. The report settings are not saved.